![]() | ||||||||||||||||||||
![]() | ||||||||||||||||||||
Casa Estela 2000 | ||||||||||||||||||||
When I arrived this year it was "Semana Santa". I took the first week to plan, and make a list of everything that was needed for the casa. I hired a panga to pick up all the materials at the Boca de Tomatlan. The bathroom was almost completely renovated. The bathroom walls were smoothed, a new floor was poured, a bench for the shower, a bathroom counter (complete with a sink), and a roof of translucent fiberglass. The kitchen counter, as well as the bathroom counter, were tiled by my brother. The plumbing for the kitchen, and bathroom sinks was done by Ric, a friend who traveled down with my brother and myself this year. I also contracted a front door to be made, and installed by a local tradesman. Finally, I stained, and painted a protective finish on the door. | ||||||||||||||||||||
![]() | ||||||||||||||||||||
![]() | ||||||||||||||||||||
![]() | ||||||||||||||||||||
![]() | ||||||||||||||||||||
![]() | ||||||||||||||||||||
![]() | ||||||||||||||||||||
![]() | ||||||||||||||||||||
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |
![]() | |||||||||||||||||||||||||||
Click on the years below to see other updates on Casa Estela | |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
For information, contact | |||||||||||||||||||||||||||
![]() | |||||||||||||||||||||||||||
![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() | ![]() |